SAFETY/ NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – FIREX WEEK OF 18 – 24 MAR 24, CHANGE TWO /HAZ OPS/CCGD5 BNM 0138-24

1. FIRING EXERCISES HAZARDOUS TO SURFACE VESSELS WILL BE
CONDUCTED DURING THE FOLLOWING TIMES AND LOCATIONS IN THE CPOA
DURING THE SUBJECT WEEK:
DATE TIME (LOCAL) SURFACE GRIDS AREA BOUND BY
—- ———— ————- ————-
21 MAR 1330-1430 15 34-38N0 076-56W4
1600-1700 34-17N5 076-45N2
33-51N2 077-31W8
34-24N3 077-30W7
THEN 3NM FROM AND
PARALLEL TO THE
SHORELINE TO THE
BEGINNING POINT

24 MAR 1200-2400 17 34-17N5 076-45W2
33-49N9 076-30W6
33-33N2 076-55W3
34-04N1 077-07W1
2. FOR SECTOR NORTH CAROLINA, BROADCAST UNTIL CANCELLED.
CANCEL AT//250409Z MAR 24//

BT

Source: District 5 DPW