SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) HAZOPS – FIREX WEEK OF 21 – 27 OCT 24, CHANGE ONE/HAZ OPS/CCGD5 BNM 0512-24

1. FIRING EXERCISES HAZARDOUS TO SURFACE VESSELS WILL BE
CONDUCTED DURING THE FOLLOWING TIMES AND LOCATIONS IN THE CPOA
DURING THE SUBJECT WEEK:
DATE TIME (L) SURFACE GRIDS AREA BOUND BY
——- ——— ————- —————-
21-25OCT 2000-1959 W-122(17) 34-17N5 076-45W2
33-49N9 076-30W6
33-33N2 076-55W3
34-04N1 077-07W1
24-25 OCT 0600-2000 W-122(15B) 34-35N5 077-09W3
34-30N0 077-05W9
34-26N5 077-16W1
34-30N0 077-16W1
THEN 3NM FROM AND
PARALLEL TO THE
SHORELINE.
2. FOR SECTOR NORTH CAROLINA, BROADCAST UNTIL CANCELLED.
CANCEL AT//280600Z OCT 24//

BT

Source: District 5 DPW
Link: SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) HAZOPS – FIREX WEEK OF 21 – 27 OCT 24, CHANGE ONE/HAZ OPS/CCGD5 BNM 0512-24