1. FIRING EXERCISES HAZARDOUS TO SURFACE VESSELS WILL BE
CONDUCTED DURING THE FOLLOWING TIMES AND LOCATIONS IN THE CPOA
DURING THE SUBJECT WEEK:
DATE TIME (L) SURFACE GRIDS AREA BOUND BY
—————————————————————————————–
06-12 MAY 0000-2359 W-122(17) 34-17N5 076-45W2
33-49N9 076-30W6
33-33N2 076-55W3
34-04N1 077-07W1
08 MAY 0600-1800 W-122(15B) 34-35N5 077-09W3
34-30N0 077-05W9
34-26N5 077-16W1
34-30N0 077-16W1
THEN 3NM FROM AND
PARALLEL TO THE
SHORELINE.
2. FOR SECTOR NORTH CAROLINA, BROADCAST UNTIL CANDCELLED.
CANCEL AT//130407Z MAY 24//
BT
Source: District 5 DPW
Link: SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 06 – 12 MAY 24/HAZ OPS/CCGD5 BNM 0234-24