SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 07 – 13 APR 25, CHANGE TWO/HAZ OPS/CCGD5 BNM 0154-25

1. FIRING EXERCISES HAZARDOUS TO SURFACE VESSELS WILL BE
CONDUCTED DURING THE FOLLOWING TIMES AND LOCATIONS IN THE CPOA
DURING THE SUBJECT WEEK:
DATE TIME (LOCAL) SURFACE GRIDS AREA BOUND BY
—- ———— ————- ————-
09-10 APR 1900-2245 7 34-19N7 074-37W1
36-16N6 072-08W7
35-42N4 071-30W1
33-46N6 073-58W3
2. FOR SECTOR NORTH CAROLINA, BROADCAST UNTIL CANCELLED.
CANCEL AT//140815Z APR 25//

BT

Source: District 5 DPW
Link: SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 07 – 13 APR 25, CHANGE TWO/HAZ OPS/CCGD5 BNM 0154-25