SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 11 – 17 AUG 25, CHANGE ONE/HAZ OPS/CCGD5 BNM 0385-25

1. FIRING EXERCISES HAZARDOUS TO SURFACE VESSELS WILL BE
CONDUCTED DURING THE FOLLOWING TIMES AND LOCATIONS IN THE CPOA
DURING THE SUBJECT WEEK:
DATE TIME (LOCAL) SURFACE GRIDS AREA BOUND BY
—- ———— ————- ————-
14-15 AUG 0800-1900 15-19 34-38N8 076-56W4
33-20N8 076-15N9
33-00N6 076-42N9
33-00N6 077-29W5
33-10N7 077-31W8
34-24N3 077-30W7
THEN 3NM FROM AND
PARALLEL TO THE
SHORELINE TO THE
BEGINNING POINT
17 AUG 1200-2200 17 34-17N5 076-45W2
33-49N9 076-30W6
33-33N2 076-55W3
34-04N1 077-07W1
2. FOR SECTOR NORTH CAROLINA, BROADCAST UNTIL CANCELLED.
CANCEL AT//180427Z AUG 25//

BT

Source: District 5 DPW
Link: SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 11 – 17 AUG 25, CHANGE ONE/HAZ OPS/CCGD5 BNM 0385-25