SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 16 – 22 SEP 24, CHANGE ONE/HAZ OPS/CCGD5 BNM 0476-24

1. FIRING EXERCISES HAZARDOUS TO SURFACE VESSELS WILL BE
CONDUCTED DURING THE FOLLOWING TIMES AND LOCATIONS IN THE CPOA
DURING THE SUBJECT WEEK:
DATE TIME (LOCAL) SURFACE GRIDS AREA BOUND BY
—- ———— ————- ————-
18 SEP 1300-1700 08,09,11,15-19 34-50N2 076-14W8
19 SEP 1100-1500 34-41N2 076-04W7
34-28N7 076-24W9
33-39N8 075-45W1
33-00N6 076-42W9
33-00N6 077-23W9
33-10N7 077-31W8
34-24N3 077-31W8
34-39N9 076-41W8
34-50N2 076-14W8
2. FOR SECTOR NORTH CAROLINA, BROADCAST UNTIL CANCELLED.
CANCEL AT//230816Z SEP 24//

BT

Source: District 5 DPW
Link: SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 16 – 22 SEP 24, CHANGE ONE/HAZ OPS/CCGD5 BNM 0476-24