SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 22 – 28 JUL 24, CHANGE FIVE/HAZ OPS/CCGD5 BNM 0391-24

1. FIRING EXERCISES HAZARDOUS TO SURFACE VESSELS WILL BE
CONDUCTED DURING THE FOLLOWING TIMES AND LOCATIONS IN THE CPOA
DURING THE SUBJECT WEEK:
DATE TIME (LOCAL) SURFACE GRIDS AREA BOUND BY
—- ———— ————- ————-
27-28 JUL 0000-0500 13, 14, 21, 23 32-00N5 076-41W8
32-39N7 076-21W6
33-08N4 075-40W6
33-26N4 075-00W2
33-21N9 074-52W8
32-36N4 075-02W4
32-09N4 075-45W1
31-54N3 076-32W8
2. FOR SECTOR NORTH CAROLINA, BROADCAST UNTIL CANCELLED.
CANCEL AT//290408Z JUL 24//

BT

Source: District 5 DPW
Link: SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 22 – 28 JUL 24, CHANGE FIVE/HAZ OPS/CCGD5 BNM 0391-24