CONTINUING UNTIL NOV 20, 2024, THE LIFT BOAT SPEEDY IS
CONDUCTING PIPELINE REMOVAL OPERATIONS THROUGH THE
SABINE PASS CHANNEL, BETWEEN APPROX POSITIONS 29-28-25.624N
093-39-56.360W AND 29-28-23.901N 093-40-05.377W. THE M/V SPEEDY
WILL UTILIZE AN 8-POINT MOORING SYSTEM FOR THE OPERATION
AND WILL BE LIMITED IN MANEUVERABILITY. MARINERS SHOULD
COORDINATE PASSING ARRANGEMENTS ON VHF-FM CHANNEL 16.
CANCEL AT//210600Z NOV 24//
BT
Source: District 8 DPW
Link: SAFETY/TX – GULF OF MEXICO/HAZ OPS/CCGD8 BNM 0085-24