SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 18 – 24 MAR 24/HAZ OPS/CCGD5 BNM 0129-24

1. FIRING EXERCISES HAZARDOUS TO SURFACE VESSELS WILL BE
CONDUCTED DURING THE FOLLOWING TIMES AND LOCATIONS IN THE CPOA
DURING THE SUBJECT WEEK:
DATE TIME (LOCAL) SURFACE GRIDS AREA BOUND BY
———————————————————————————————–
18 MAR 1200-1600 1 35-30N1 075-25W9
35-13N2 075-05N7
34-40N1 076-04W7
34-50N2 076-15W9
THEN 3NM FROM AND
PARALLEL TO THE
SHORELINE TO THE
BEGINNING POINT
21-24 MAR 1200-2400 17 34-17N5 076-45W2
33-49N9 076-30W6
33-33N2 076-55W3
34-04N1 077-07W1
21 MAR 1330-1430 15 34-38N0 076-56W4
1600-1700 34-17N5 076-45N2
33-51N2 077-31W8
34-24N3 077-30W7
THEN 3NM FROM AND
PARALLEL TO THE
SHORELINE TO THE
BEGINNING POINT
2. FOR SECTOR NORTH CAROLINA, BROADCAST UNTIL CANCELLED.
CANCEL AT//250409Z MAR 24//

BT

Source: District 5 DPW
Link: SAFETY/NC – CHERRY POINT OPERATING AREA (CPOA) – HAZOPS – WEEK OF 18 – 24 MAR 24/HAZ OPS/CCGD5 BNM 0129-24